Deprecated: mysql_pconnect(): The mysql extension is deprecated and will be removed in the future: use mysqli or PDO instead in /home/hecge/public_html/_manager/bootstrap.php on line 69

Warning: Cannot modify header information - headers already sent by (output started at /home/hecge/public_html/_manager/bootstrap.php:69) in /home/hecge/public_html/index.php on line 22
Construction of Coastal Protection Facility in anaklia - Hydro Engineering Company

Construction of Coastal Protection Facility in anaklia

Construction of Coastal Protection Facility in anaklia

Construction of Coastal Protection Facility in anaklia

The coast line of Anaklia have been washed out and flooded over the years. Because of pollution the coast line doesn’t comply to the resort standards and by the Government of Georgia the project have been designed about Construction of Coastal protection Facility in Anaklia including of the rv.Enguri mouth. Within the project JSC „Hydro Engineering Company” began production of 5 ton and 10 ton tetrapod with the using of special forms, underwater breakwater will be installed 200-300m distance from the shore. Protection facility will be installed after cleaning the rv. Enguri mouth and bed (with dredge). According to the project at the end of the construction of coastal protection facility the coast line will be cleaned and filled with soil (with special sand).

anaklia 1
anaklia 2
anaklia 3
anaklia 4
anaklia 5
anaklia 6
anaklia 7
anaklia 8